Tate Access Floors

Search Web Site Search
 

Plenum Integrity Guides

Tate Access Floors, Inc. is proud to provide three best practices guides to aid in the proper design and construction of an underfloor air distribution (UFAD) system. Trade specific guides have been created for the Architect, General Contractor, and Commissioning Agent extracted from lessons learned through Tate’s experience working on a wide range of UFAD projects. These guides will help to ensure the proper sealing and reduction of underfloor air leakage in an access floor air plenum. Furthermore, Tate believes a holistic approach to design and construction should be used and recommends regular consultation be held with key individuals on the construction team throughout the entire design process.

 


Architect’s Guide for Detailing & Specifying Access Floor Air Plenum

This guide is designed to help an architect designing a building with a UFAD system, provide specifications and construction details to ensure the plenum is constructed with proper sealing to reduce underfloor air leakage.

The Architects Guide Provides:

  • Recommended steps to success
  • General Construction Specifications
  • Specification language for each division
  • Construction Sealing Details
CSI Specification Language 77 KB Word

Drawings
Download Architect's Guide 2.3 MB PDF

GC’s Guide for Constructing & Sealing Access Floor Air Plenums

The general contractor guide will aid in the coordination of subcontractors and provide methods to ensure they are informed of, and perform to the sealing requirements as described in the specifications and details provided by the architect. This guide will help you ensure every contractor working in the plenum space is aware of their responsibilities before they submit their bids or begin construction and that they are equipped with the information needed to successfully complete their work while maintaining plenum integrity and reducing underfloor air leakage.

The GC’s Guide Provides:

  • Recommended steps to success
  • Recommended Construction sequence
  • Inspection Checklist
Inspection List 80 KB Word

General Contractor Guidelines 70 KB Word

Download GC Guide 550 KB PDF

Commissioning Agent’s Guide for Inspecting & Testing Access Floor Air Plenums

This guide was created to provide commissioning agents with proper guidelines for the review, inspection, testing, and reporting of any plenum integrity sealing deficiencies that may result in underfloor air leakage. The recommendations contained within this guide are provided to help the commissioning agent perform the responsibilities required to ensure plenum integrity.

The Commissioning Guide Provides:

  • Recommended steps to success
  • A plenum inspection Checklist
  • Definitions of types of air leakage
  • Air leakage test procedures
  • A sample test report
Plenum Inspection & Reporting Checklist 130 KB Word

Download Commissioning Guide 520 KB PDF
 
 
Building Solutions
 
 
 
 
Sustainability E-News
 
Application examples,
tech bulletins, & news.
Enter your email address to subscribe:

Add Remove
Send As HTML
 
 
 
Learn More